What is predictive maintenance, and what data does it need?

Predictive maintenance uses asset data to forecast failure so work is done when needed. Its limits are set by failure history and data quality.

By iFortis Worldwide ResearchPublished Updated 3 min read

On this page

SummaryPredictive maintenance uses condition and operating data to estimate when an asset is likely to fail, so that work is scheduled before the failure and not on a fixed calendar. It needs sensor readings, operating context, maintenance records and labelled failure history.

Three ways to maintain an asset

Reactive maintenance fixes things when they break. Preventive maintenance services them on a schedule, whether or not they need it. Predictive maintenance watches the condition of the asset and intervenes when the data shows a fault developing.

None of the three is always right. A cheap, redundant component can be run to failure. A safety-critical one may need fixed inspections by law. Prediction pays where failure is costly, gives warning signs, and can be acted on in time.

How prediction works

Most mechanical and electrical faults develop over time. A bearing heats up. Vibration changes character. Current draw rises. A model learns the normal pattern for the asset in each operating mode and flags departures from it. With enough failure history, it can go further and estimate remaining useful life or name the likely fault.

Two families of method are common. Anomaly detection needs only examples of healthy operation and tells you something is unusual. Failure prediction needs past failures to learn from and tells you what is likely to happen and when. Many programmes start with the first and grow into the second.

The data it depends on

  • Condition data. Vibration, temperature, pressure, acoustic, oil analysis, electrical signatures, at a sampling rate that suits the fault.
  • Operating context. Load, speed, product, ambient conditions. Without it, a change in duty looks like a fault.
  • Maintenance history. Work orders with what was found, what was done and which part was replaced.
  • Failure records. Dated, with failure mode and cause. This is the scarcest and most valuable input.
  • Asset master data. Make, model, age, configuration and position in the hierarchy.

The usual obstacle is the maintenance record. Free-text work orders that say "repaired pump" carry little a model can learn from.

Why programmes stall

  • Too few failures to learn from, because good preventive maintenance has kept them rare.
  • Alerts that arrive with no recommended action, so planners ignore them.
  • Too many false alarms in the first months, which costs trust that is hard to regain.
  • Models built for one asset and assumed to transfer to others of a different age or duty.
  • No link to the maintenance planning system, so predictions stay on a dashboard.

From alert to completed work

A prediction has no value until a job is planned, parts are available and the work is done at a sensible time. The stronger designs connect the model to planning: an alert raises a draft work order, checks spares, proposes a slot against the production plan and routes it for approval. This is a natural task for an agent working within set limits, and it is where an intelligence layer above the maintenance and ERP systems earns its place. See industrial and physical AI for the wider picture.

Getting a programme under way

Rank assets by the cost of unplanned failure. Take the top few and check what data already exists. Fix work order coding before adding sensors. Begin with anomaly detection on one asset class, agree with maintenance planners what each alert should trigger, and track outcomes: faults caught, false alarms, failures missed. Expand when the hit rate earns the confidence of the people who act on it. A related tool is the digital twin, which can test maintenance timing against production.

What an operations leader should ask

  • Which failures are we trying to predict, and what does each cost?
  • How much warning do we need for the prediction to be useful?
  • How many labelled failures do we have for those assets?
  • What happens, step by step, after an alert?
  • How will we measure missed failures as well as caught ones?